End of line surplus electrical & lighting — SWA 16mm² 3-core armoured cable (180m drum) — NottinghamEnd of line Job lot

SWA 16mm² 3-core armoured cable (180m drum) — Nottingham

Nottingham·180m drum·Listed 27d ago
£460/lot

Sold by Nottingham Site Clearance Ltd (Demolition) · Ref L0668

Condition grade 10/10 (End of line). Assessed by the seller at listing; figures below relate to this specific lot of 180m drum.

About this lot

Part-used drum. Brand new, BASEC approved. Ideal for outbuilding sub-mains and EV charger installations. Located in Nottingham — collection or arranged regional delivery available. Fresh to market — posted 27 days ago by Nottingham demolition Nottingham Site Clearance Ltd.

Surplus stock like this exists because projects over-order to avoid downtime — the saving gets passed to you instead of the skip. End-of-line means first quality with no re-order — quantity certainty matters more than usual, so check coverage twice.

Measurements & specifications

CSA
3 × 16mm²
Approval
BASEC BS5467
Location
Nottingham
Ref
SB-71-10
Quantity / lot size
180m drum
Electrical safety
Insulation-resistance tested before listing
Standards
BS 7671 18th Edition compatible
Batch check
5 units function-tested from the lot
Packaging
On original drum/reel

Condition report & known defects

10/10
  • Discontinued finish/range — order full quantities, no top-ups available.
  • No re-order possible: buy the full quantity you need from this lot.

Carbon & sustainability notes

No reuse CO₂ credit is claimed on this lot: it is unused stock, so the embodied carbon was committed at manufacture. Buying it still prevents waste — material sent to landfill or energy recovery delivers none of its embodied value.

With Part Z and embodied-carbon reporting moving up the agenda, documented reuse like this is increasingly worth recording in your project's carbon log.

Collection & delivery

  • Collection from the seller's Nottingham premises — kerbside hand-load or forklift by arrangement.
  • Nationwide pallet courier available — typically £75–£130 per pallet, 2–4 working days.
  • Viewings welcomed by appointment; the measurements table above reflects what was checked at listing.

Typical applications

  • EV charger sub-main runs (SWA stock)
  • Hospitality and retail feature lighting
  • Garden, outbuilding and security lighting
  • Full rewires and consumer unit upgrades

How to buy, collect and install this lot

  1. 1Confirm your requirement against the measurements above — bring a tape and the 180m drum figure when you visit Nottingham Site Clearance Ltd in Nottingham.
  2. 2Reserve the lot in writing with a deposit; get the batch/reference (L0668) and condition grade (10/10) on the receipt.
  3. 3Arrange transport: pallet truck on site; tail-lift vehicles recommended. Confirm access at your delivery address (width, overhead clearance, forklift or hand-ball).
  4. 4On arrival, check the count against the 180m drum stated and photograph any transit damage before signing the delivery note.
  5. 5Store correctly on site — for electrical, that means dry, level and off the ground; keep original packaging on until the day of use where possible.
  6. 6Dry-lay or trial-fit a small sample first to confirm electrical performs as expected in your specific application before committing the whole lot.
  7. 7Log the reuse for your project records: photograph the seller invoice, capture the ~0 kg CO₂e figure and save this listing URL in your embodied-carbon file.

Pre-purchase checklist

  • Measure twice — confirm 180m drum covers your net requirement plus a 8% waste/cutting allowance.
  • View in person or request a video walkround from Nottingham Site Clearance Ltd; do not rely on the hero photograph alone.
  • Check condition against the 10/10 grade above — ask which specific defects apply to the units you'll actually receive.
  • Confirm the batch or shade reference (L0668) so what you inspect is what you collect.
  • Agree collection or delivery cost in writing — pallet, hiab, flatbed or hand-ball each price very differently.
  • Verify VAT position: is the £460/lot figure ex-VAT or inclusive? Trade sellers default to ex-VAT.
  • Ask about returns or replacements if the delivered quantity falls short — reputable demolitions stand behind the stated count.
  • Screenshot this listing (title, price, condition, CO₂ figure) as your negotiation baseline — surplus prices drift as lots age.
  • Check compatibility if you're matching existing material (brick blend, tile shade, timber section) with a physical sample first.
  • Book collection or delivery within your reservation window — end of line lots at this price rarely sit for long.

Price in context

  • At £460/lot, this lot sits roughly 25% below current UK merchant list for equivalent new material — the typical spread for end of line electrical.
  • Delivered-to-door pricing (including pallet freight within ~57 miles of Nottingham) tends to add £75–£115 to the headline figure; collection stays as advertised.
  • Comparable end of line lots in the surplus electrical & lighting category have moved on SurplusBuilder within 4 days of listing — well-priced surplus doesn't linger.

Sustainability deep-dive

The headline saving on this listing (waste avoidance) is benchmarked against manufacturing new fittings and copper cable (copper ~4 kg CO₂e per kg; an LED panel ~25 kg CO₂e). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.

In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing electrical like this lot from Nottingham bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.

For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.

Beyond carbon: buying this lot from Nottingham Site Clearance Ltd keeps first-quality electrical out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.

Questions about this lot

Can surplus electrical gear be used in a certified install?+

Yes — new surplus carries the same markings and standards as merchant stock. Your electrician certifies the installation, not the purchase route.

Is part-used cable drum length guaranteed?+

The stated length is measured, not estimated — Nottingham Site Clearance Ltd re-measures drums on listing with a ±1m tolerance.

Are the LED fittings covered by warranty?+

End-of-line stock typically retains the manufacturer's product warranty from date of purchase — keep the invoice as proof.

What payment and paperwork should I expect from Nottingham Site Clearance Ltd?+

Nottingham Site Clearance Ltd issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £500 we recommend a written spec confirmation before paying, so the exact electrical description and quantity are on record.

Can I reserve this lot while I organise transport from Nottingham?+

A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially end of line lots at this price point — confirm the hold in writing so the seller doesn't re-list.

Is this suitable for a Part L / Part Z reporting project?+

The material itself carries the same certifications as merchant stock; document the reuse route in your carbon log even without a specific CO₂e figure — waste avoidance still counts under Part Z reporting guidance.

More surplus electrical & lighting

View all →