Surplus consumer units — Hager 18-way (×4)
Hager Design 30 metal-clad consumer units, 18-way dual-RCD. All new, boxed. Surplus to a residential development. 18th Edition compliant.
Sold by London Reclaim Co. (Demolition) · Ref L0718
Condition grade 7/10 (Reclaimed). Assessed by the seller at listing; figures below relate to this specific lot of 20 fittings.
Discontinued anthracite up/down outdoor lights. Integrated LED, warm white. Located in London — collection or arranged regional delivery available. Offered by London Reclaim Co. (demolition) from their London yard, listed 13 days ago.
Site over-orders, cancelled jobs and careful strip-outs are where the best material bargains in the UK come from — this lot is one of them. It is sold as reclaimed: character included, surprises excluded — read the defect notes below before bidding your time.
Choosing this lot over new product avoids an estimated 40 kg CO₂e — benchmarked against manufacturing new fittings and copper cable (copper ~4 kg CO₂e per kg; an LED panel ~25 kg CO₂e).
For scale: roughly 236 km in a typical petrol car, or a year's absorption for 2 established trees.
With Part Z and embodied-carbon reporting moving up the agenda, documented reuse like this is increasingly worth recording in your project's carbon log.
The headline saving on this listing (~40 kg CO₂e) is benchmarked against manufacturing new fittings and copper cable (copper ~4 kg CO₂e per kg; an LED panel ~25 kg CO₂e). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.
In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing electrical like this lot from London bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.
For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.
Beyond carbon: buying this lot from London Reclaim Co. keeps first-quality electrical out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.
Yes — new surplus carries the same markings and standards as merchant stock. Your electrician certifies the installation, not the purchase route.
The stated length is measured, not estimated — London Reclaim Co. re-measures drums on listing with a ±1m tolerance.
End-of-line stock typically retains the manufacturer's product warranty from date of purchase — keep the invoice as proof.
London Reclaim Co. issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £500 we recommend a written spec confirmation before paying, so the exact electrical description and quantity are on record.
A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially reclaimed lots at this price point — confirm the hold in writing so the seller doesn't re-list.
Yes — the ~40 kg CO₂e saving is calculable against the benchmark in the sustainability notes above; keep this listing URL as evidence for your embodied-carbon log.
Hager Design 30 metal-clad consumer units, 18-way dual-RCD. All new, boxed. Surplus to a residential development. 18th Edition compliant.
Commercial-grade ceiling panels, boxed and sealed. Surplus from an office fit-out. For grid ceilings. Located in London — collection or arranged regional delivery available.
Part-used drum. Brand new, BASEC approved. Ideal for outbuilding sub-mains and EV charger installations. Located in London — collection or arranged regional delivery available.