Surplus armoured cable SWA 16mm² (180m)
16mm² 3-core SWA cable on a part-used drum. Brand new, BASEC approved. Ideal for outbuilding sub-mains and EV charger installations.
Sold by Birmingham Site Clearance Ltd (Demolition) · Ref L0684
Condition grade 9/10 (End of line). Assessed by the seller at listing; figures below relate to this specific lot of 30 pendants.
Discontinued range. Perfect for cafés, restaurants and on-trend domestic kitchens. Located in Birmingham — collection or arranged regional delivery available. Direct from Birmingham Site Clearance Ltd, a demolition operating out of Birmingham; live for 23 days.
This is exactly the kind of material that typically ends up in a skip costing the seller money; buying it diverts it back into a build. The range is discontinued: what is listed here is the entire available quantity.
This listing carries no CO₂-saved figure because the material is new; the sustainability win here is waste prevention — first-quality stock staying out of the waste stream entirely.
With Part Z and embodied-carbon reporting moving up the agenda, documented reuse like this is increasingly worth recording in your project's carbon log.
The headline saving on this listing (waste avoidance) is benchmarked against manufacturing new fittings and copper cable (copper ~4 kg CO₂e per kg; an LED panel ~25 kg CO₂e). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.
In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing electrical like this lot from Birmingham bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.
For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.
Beyond carbon: buying this lot from Birmingham Site Clearance Ltd keeps first-quality electrical out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.
Yes — new surplus carries the same markings and standards as merchant stock. Your electrician certifies the installation, not the purchase route.
The stated length is measured, not estimated — Birmingham Site Clearance Ltd re-measures drums on listing with a ±1m tolerance.
End-of-line stock typically retains the manufacturer's product warranty from date of purchase — keep the invoice as proof.
Birmingham Site Clearance Ltd issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £500 we recommend a written spec confirmation before paying, so the exact electrical description and quantity are on record.
A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially end of line lots at this price point — confirm the hold in writing so the seller doesn't re-list.
The material itself carries the same certifications as merchant stock; document the reuse route in your carbon log even without a specific CO₂e figure — waste avoidance still counts under Part Z reporting guidance.
16mm² 3-core SWA cable on a part-used drum. Brand new, BASEC approved. Ideal for outbuilding sub-mains and EV charger installations.
Commercial-grade ceiling panels, boxed and sealed. Surplus from an office fit-out. For grid ceilings. Located in Birmingham — collection or arranged regional delivery available.
Part-used drum. Brand new, BASEC approved. Ideal for outbuilding sub-mains and EV charger installations. Located in Birmingham — collection or arranged regional delivery available.