Reclaimed Victorian cast iron radiators (×4)
Four matching 6-column cast iron radiators, each 1.2m long × 0.7m high. Stripped, pressure tested to 6 bar, ready for primer and topcoat. Perfect for restoration or modern industrial interiors.
Sold by Edinburgh Site Clearance Ltd (Demolition) · Ref L0592
Condition grade 10/10 (End of line). Assessed by the seller at listing; figures below relate to this specific lot of 1 boiler.
Brand new combi, boxed and sealed. Cancelled installation. 60% off RRP. Located in Edinburgh — collection or arranged regional delivery available. Listed 19 days ago by Edinburgh Site Clearance Ltd, a demolition based in Edinburgh.
Every lot here was once destined for waste transfer — listing it instead keeps first-quality material in circulation at well below merchant list. End-of-line means first quality with no re-order — quantity certainty matters more than usual, so check coverage twice.
No reuse CO₂ credit is claimed on this lot: it is unused stock, so the embodied carbon was committed at manufacture. Buying it still prevents waste — material sent to landfill or energy recovery delivers none of its embodied value.
If your project tracks embodied carbon (BREEAM, Part Z readiness, or client ESG reporting), keep this listing reference as evidence of avoided emissions.
The headline saving on this listing (waste avoidance) is benchmarked against manufacturing new heating plant (a cast-iron radiator ~45 kg CO₂e; a boiler ~300 kg CO₂e). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.
In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing plumbing like this lot from Edinburgh bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.
For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.
Beyond carbon: buying this lot from Edinburgh Site Clearance Ltd keeps first-quality plumbing out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.
Sealed, unregistered boilers can usually be registered by your Gas Safe installer at commissioning — confirm the serial with the manufacturer before purchase.
Yes — Edinburgh Site Clearance Ltd tests before listing; the bar rating and duration are in the measurements table for this exact lot.
Gas appliances must be installed by a Gas Safe registered engineer; unvented cylinders need a G3-qualified installer. Wet UFH and radiators can be fitted by a competent plumber.
Edinburgh Site Clearance Ltd issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £500 we recommend a written spec confirmation before paying, so the exact plumbing description and quantity are on record.
A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially end of line lots at this price point — confirm the hold in writing so the seller doesn't re-list.
The material itself carries the same certifications as merchant stock; document the reuse route in your carbon log even without a specific CO₂e figure — waste avoidance still counts under Part Z reporting guidance.
Four matching 6-column cast iron radiators, each 1.2m long × 0.7m high. Stripped, pressure tested to 6 bar, ready for primer and topcoat. Perfect for restoration or modern industrial interiors.
Stripped, pressure tested to 6 bar, ready for primer. Perfect for restoration or industrial interiors. Located in Edinburgh — collection or arranged regional delivery available.
Bundle of new copper tube, BSI marked. Surplus from a commercial first-fix. Cut lengths 2–6m. Located in Edinburgh — collection or arranged regional delivery available.