Bathroom suite — surplus (basin, WC, bath)
Discontinued suite — 1700mm steel bath, close-coupled WC and 600mm pedestal basin. All new in original packaging.
Condition grade 6/10 (B-grade). Assessed by the seller at listing; figures below relate to this specific lot of Full kit.
Surplus UFH kit with actuators, blending valve and pump. Enough for ~80m². Located in Cardiff — collection or arranged regional delivery available. Direct from Cardiff Urban Reclamation, a demolition operating out of Cardiff; live for 12 days.
This is exactly the kind of material that typically ends up in a skip costing the seller money; buying it diverts it back into a build. It is graded down on appearance alone; structurally and functionally it performs as A-grade.
This listing carries no CO₂-saved figure because the material is new; the sustainability win here is waste prevention — first-quality stock staying out of the waste stream entirely.
With Part Z and embodied-carbon reporting moving up the agenda, documented reuse like this is increasingly worth recording in your project's carbon log.
The headline saving on this listing (waste avoidance) is benchmarked against manufacturing new heating plant (a cast-iron radiator ~45 kg CO₂e; a boiler ~300 kg CO₂e). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.
In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing plumbing like this lot from Cardiff bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.
For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.
Beyond carbon: buying this lot from Cardiff Urban Reclamation keeps first-quality plumbing out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.
Sealed, unregistered boilers can usually be registered by your Gas Safe installer at commissioning — confirm the serial with the manufacturer before purchase.
Yes — Cardiff Urban Reclamation tests before listing; the bar rating and duration are in the measurements table for this exact lot.
Gas appliances must be installed by a Gas Safe registered engineer; unvented cylinders need a G3-qualified installer. Wet UFH and radiators can be fitted by a competent plumber.
Cardiff Urban Reclamation issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £250 we recommend a written spec confirmation before paying, so the exact plumbing description and quantity are on record.
A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially b-grade lots at this price point — confirm the hold in writing so the seller doesn't re-list.
The material itself carries the same certifications as merchant stock; document the reuse route in your carbon log even without a specific CO₂e figure — waste avoidance still counts under Part Z reporting guidance.
Discontinued suite — 1700mm steel bath, close-coupled WC and 600mm pedestal basin. All new in original packaging.
Stripped, pressure tested to 6 bar, ready for primer. Perfect for restoration or industrial interiors. Located in Cardiff — collection or arranged regional delivery available.
Bundle of new copper tube, BSI marked. Surplus from a commercial first-fix. Cut lengths 2–6m. Located in Cardiff — collection or arranged regional delivery available.