Surplus C24 graded timber 4.8m × 30 lengths
Surplus C24 PEFC-certified structural timber from a timber-frame project. Kiln-dried, grade-stamped. Suitable for joists, rafters and load-bearing studwork.
Sold by Manchester Greenfield Contractors (Contractor) · Ref L0143
Condition grade 9/10 (New surplus). Assessed by the seller at listing; figures below relate to this specific lot of 30 lengths · 47×175mm.
Surplus PEFC-certified structural timber. Kiln-dried, grade-stamped. Suitable for joists, rafters and load-bearing studwork. Located in Manchester — collection or arranged regional delivery available. Direct from Manchester Greenfield Contractors, a contractor operating out of Manchester; live for 22 days.
This is exactly the kind of material that typically ends up in a skip costing the seller money; buying it diverts it back into a build. This is unused, current-spec material — the only thing second-hand about it is the price tag logic.
Choosing this lot over new product avoids an estimated 33 kg CO₂e — benchmarked against felling, milling and kiln-drying virgin softwood (~0.45 kg CO₂e per kg of new timber).
For scale: roughly 195 km in a typical petrol car, or a year's absorption for 2 established trees.
With Part Z and embodied-carbon reporting moving up the agenda, documented reuse like this is increasingly worth recording in your project's carbon log.
The headline saving on this listing (~33 kg CO₂e) is benchmarked against felling, milling and kiln-drying virgin softwood (~0.45 kg CO₂e per kg of new timber). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.
In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing timber like this lot from Manchester bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.
For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.
Beyond carbon: buying this lot from Manchester Greenfield Contractors keeps first-quality timber out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.
Where the listing states a grade (C16/C24) the stamp is on the timber. Reclaimed boards from Manchester Greenfield Contractors are sold for non-structural use unless re-graded by an inspector.
The seller has metal-detected the stock; expect the odd missed fixing — budget 1 saw blades for a lot this size and check with a detector before machining.
Keep it stick-stacked, off the ground and under cover, and let it acclimatise on site for 7–14 days before fixing internally.
Manchester Greenfield Contractors issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £500 we recommend a written spec confirmation before paying, so the exact timber description and quantity are on record.
A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially new surplus lots at this price point — confirm the hold in writing so the seller doesn't re-list.
Yes — the ~33 kg CO₂e saving is calculable against the benchmark in the sustainability notes above; keep this listing URL as evidence for your embodied-carbon log.
Surplus C24 PEFC-certified structural timber from a timber-frame project. Kiln-dried, grade-stamped. Suitable for joists, rafters and load-bearing studwork.
Genuine reclaimed scaffold boards with banded ends. Perfect for shelving, cladding, garden furniture and rustic decking. Located in Manchester — collection or arranged regional delivery available.
Surplus tongue-and-groove flooring from a cancelled order. Sealed pack, dry-stored under cover. Located in Manchester — collection or arranged regional delivery available.