Surplus copper pipe 22mm — 60m bundle
Bundle of new 22mm copper tube (Yorkshire half-hard, BSI marked). Surplus from a commercial first-fix. Cut lengths 2–6m.
Sold by Manchester Greenfield Contractors (Contractor) · Ref L0623
Condition grade 10/10 (New surplus). Assessed by the seller at listing; figures below relate to this specific lot of 3 cylinders.
Three cylinders from a hotel refurb. Good condition, no leaks, immersion bosses intact. Located in Manchester — collection or arranged regional delivery available. Listed 6 days ago by Manchester Greenfield Contractors, a contractor based in Manchester.
Every lot here was once destined for waste transfer — listing it instead keeps first-quality material in circulation at well below merchant list. As new surplus it is indistinguishable from merchant stock except for the price.
Reusing this material saves roughly 49 kg CO₂e versus manufacturing new heating plant (a cast-iron radiator ~45 kg CO₂e; a boiler ~300 kg CO₂e).
That's equivalent to about 289 km of average petrol-car driving, or what 2 mature trees absorb in a year.
Reuse is the single fastest way to cut a build's embodied carbon — substitution beats offsetting every time.
The headline saving on this listing (~49 kg CO₂e) is benchmarked against manufacturing new heating plant (a cast-iron radiator ~45 kg CO₂e; a boiler ~300 kg CO₂e). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.
In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing plumbing like this lot from Manchester bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.
For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.
Beyond carbon: buying this lot from Manchester Greenfield Contractors keeps first-quality plumbing out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.
Sealed, unregistered boilers can usually be registered by your Gas Safe installer at commissioning — confirm the serial with the manufacturer before purchase.
Yes — Manchester Greenfield Contractors tests before listing; the bar rating and duration are in the measurements table for this exact lot.
Gas appliances must be installed by a Gas Safe registered engineer; unvented cylinders need a G3-qualified installer. Wet UFH and radiators can be fitted by a competent plumber.
Manchester Greenfield Contractors issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £500 we recommend a written spec confirmation before paying, so the exact plumbing description and quantity are on record.
A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially new surplus lots at this price point — confirm the hold in writing so the seller doesn't re-list.
Yes — the ~49 kg CO₂e saving is calculable against the benchmark in the sustainability notes above; keep this listing URL as evidence for your embodied-carbon log.
Bundle of new 22mm copper tube (Yorkshire half-hard, BSI marked). Surplus from a commercial first-fix. Cut lengths 2–6m.
Stripped, pressure tested to 6 bar, ready for primer. Perfect for restoration or industrial interiors. Located in Manchester — collection or arranged regional delivery available.
Bundle of new copper tube, BSI marked. Surplus from a commercial first-fix. Cut lengths 2–6m. Located in Manchester — collection or arranged regional delivery available.