New surplus surplus plumbing & heating — Reclaimed 6-column cast iron rads (4 units) — SheffieldNew surplus

Reclaimed 6-column cast iron rads (4 units) — Sheffield

Sheffield·4 units·Listed 18d ago
£510/lot
~63kg CO₂e saved

Sold by Sheffield Greenfield Contractors (Contractor) · Ref L0571

Condition grade 10/10 (New surplus). Assessed by the seller at listing; figures below relate to this specific lot of 4 units.

About this lot

Stripped, pressure tested to 6 bar, ready for primer. Perfect for restoration or industrial interiors. Located in Sheffield — collection or arranged regional delivery available. Fresh to market — posted 18 days ago by Sheffield contractor Sheffield Greenfield Contractors.

Surplus stock like this exists because projects over-order to avoid downtime — the saving gets passed to you instead of the skip. As new surplus it is indistinguishable from merchant stock except for the price.

Measurements & specifications

Type
6-column cast iron
Output
~1800W each
Location
Sheffield
Ref
SB-60-09
Quantity / lot size
4 units
Pressure test
Hydraulically tested before listing
Connections
BSP threaded
Compliance marks
CE/UKCA marked
Boxed weight
35 kg total lot weight (approx.)

Condition report & known defects

10/10
  • Sealed boxes; warranty registerable where stated — check the serial before installation.
  • Stored under cover since delivery; no weather exposure.

Carbon & sustainability notes

Reusing this material saves roughly 63 kg CO₂e versus manufacturing new heating plant (a cast-iron radiator ~45 kg CO₂e; a boiler ~300 kg CO₂e).

That's equivalent to about 372 km of average petrol-car driving, or what 3 mature trees absorb in a year.

Reuse is the single fastest way to cut a build's embodied carbon — substitution beats offsetting every time.

Collection & delivery

  • Collection from the seller's Sheffield premises — forklift loading available weekdays 7:30am–4pm.
  • Regional pallet delivery can be arranged from £95 depending on postcode and lead time.
  • Inspection before purchase is encouraged — bring a tape and check sample units against the measurements above.

Typical applications

  • Period radiator restoration projects
  • Self-build and renovation first/second fix
  • Landlord boiler swaps (warranty stock)
  • Underfloor heating zones and extensions

How to buy, collect and install this lot

  1. 1Confirm your requirement against the measurements above — bring a tape and the 4 units figure when you visit Sheffield Greenfield Contractors in Sheffield.
  2. 2Reserve the lot in writing with a deposit; get the batch/reference (L0571) and condition grade (10/10) on the receipt.
  3. 3Arrange transport: car/van accessible, assistance with loading provided. Confirm access at your delivery address (width, overhead clearance, forklift or hand-ball).
  4. 4On arrival, check the count against the 4 units stated and photograph any transit damage before signing the delivery note.
  5. 5Store correctly on site — for plumbing, that means dry, level and off the ground; keep original packaging on until the day of use where possible.
  6. 6Dry-lay or trial-fit a small sample first to confirm plumbing performs as expected in your specific application before committing the whole lot.
  7. 7Log the reuse for your project records: photograph the seller invoice, capture the ~63 kg CO₂e figure and save this listing URL in your embodied-carbon file.

Pre-purchase checklist

  • Measure twice — confirm 4 units covers your net requirement plus a 12% waste/cutting allowance.
  • View in person or request a video walkround from Sheffield Greenfield Contractors; do not rely on the hero photograph alone.
  • Check condition against the 10/10 grade above — ask which specific defects apply to the units you'll actually receive.
  • Confirm the batch or shade reference (L0571) so what you inspect is what you collect.
  • Agree collection or delivery cost in writing — pallet, hiab, flatbed or hand-ball each price very differently.
  • Verify VAT position: is the £510/lot figure ex-VAT or inclusive? Trade sellers default to ex-VAT.
  • Ask about returns or replacements if the delivered quantity falls short — reputable contractors stand behind the stated count.
  • Screenshot this listing (title, price, condition, CO₂ figure) as your negotiation baseline — surplus prices drift as lots age.
  • Check compatibility if you're matching existing material (brick blend, tile shade, timber section) with a physical sample first.
  • Book collection or delivery within your reservation window — new surplus lots at this price rarely sit for long.

Price in context

  • At £510/lot, this lot sits roughly 50% below current UK merchant list for equivalent new material — the typical spread for new surplus plumbing.
  • Delivered-to-door pricing (including pallet freight within ~74 miles of Sheffield) tends to add £95–£140 to the headline figure; collection stays as advertised.
  • Comparable new surplus lots in the surplus plumbing & heating category have moved on SurplusBuilder within 4 days of listing — well-priced surplus doesn't linger.

Sustainability deep-dive

The headline saving on this listing (~63 kg CO₂e) is benchmarked against manufacturing new heating plant (a cast-iron radiator ~45 kg CO₂e; a boiler ~300 kg CO₂e). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.

In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing plumbing like this lot from Sheffield bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.

For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.

Beyond carbon: buying this lot from Sheffield Greenfield Contractors keeps first-quality plumbing out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.

Questions about this lot

Is the boiler warranty valid if I buy surplus?+

Sealed, unregistered boilers can usually be registered by your Gas Safe installer at commissioning — confirm the serial with the manufacturer before purchase.

Have reclaimed radiators been pressure tested?+

Yes — Sheffield Greenfield Contractors tests before listing; the bar rating and duration are in the measurements table for this exact lot.

Who should install this?+

Gas appliances must be installed by a Gas Safe registered engineer; unvented cylinders need a G3-qualified installer. Wet UFH and radiators can be fitted by a competent plumber.

What payment and paperwork should I expect from Sheffield Greenfield Contractors?+

Sheffield Greenfield Contractors issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £500 we recommend a written spec confirmation before paying, so the exact plumbing description and quantity are on record.

Can I reserve this lot while I organise transport from Sheffield?+

A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially new surplus lots at this price point — confirm the hold in writing so the seller doesn't re-list.

Is this suitable for a Part L / Part Z reporting project?+

Yes — the ~63 kg CO₂e saving is calculable against the benchmark in the sustainability notes above; keep this listing URL as evidence for your embodied-carbon log.

More surplus plumbing & heating

View all →