Surplus 22mm half-hard copper pipe (60m bundle) — Sheffield
Bundle of new copper tube, BSI marked. Surplus from a commercial first-fix. Cut lengths 2–6m. Located in Sheffield — collection or arranged regional delivery available.
Sold by Sheffield Greenfield Contractors (Contractor) · Ref L0571
Condition grade 10/10 (New surplus). Assessed by the seller at listing; figures below relate to this specific lot of 4 units.
Stripped, pressure tested to 6 bar, ready for primer. Perfect for restoration or industrial interiors. Located in Sheffield — collection or arranged regional delivery available. Fresh to market — posted 18 days ago by Sheffield contractor Sheffield Greenfield Contractors.
Surplus stock like this exists because projects over-order to avoid downtime — the saving gets passed to you instead of the skip. As new surplus it is indistinguishable from merchant stock except for the price.
Reusing this material saves roughly 63 kg CO₂e versus manufacturing new heating plant (a cast-iron radiator ~45 kg CO₂e; a boiler ~300 kg CO₂e).
That's equivalent to about 372 km of average petrol-car driving, or what 3 mature trees absorb in a year.
Reuse is the single fastest way to cut a build's embodied carbon — substitution beats offsetting every time.
Sealed, unregistered boilers can usually be registered by your Gas Safe installer at commissioning — confirm the serial with the manufacturer before purchase.
Yes — Sheffield Greenfield Contractors tests before listing; the bar rating and duration are in the measurements table for this exact lot.
Gas appliances must be installed by a Gas Safe registered engineer; unvented cylinders need a G3-qualified installer. Wet UFH and radiators can be fitted by a competent plumber.
Bundle of new copper tube, BSI marked. Surplus from a commercial first-fix. Cut lengths 2–6m. Located in Sheffield — collection or arranged regional delivery available.
Brand new combi, boxed and sealed. Cancelled installation. 60% off RRP. Located in Sheffield — collection or arranged regional delivery available.
Surplus UFH kit with actuators, blending valve and pump. Enough for ~80m². Located in Sheffield — collection or arranged regional delivery available.