OSB3 sheets 18mm — 40 sheets (job lot)
Surplus OSB3 18mm tongue-and-groove flooring sheets from a cancelled order. Sealed pack, dry-stored under cover. 32% off list price.
Condition grade 6/10 (B-grade). Assessed by the seller at listing; figures below relate to this specific lot of 25 sheets.
Brazilian WBP marine-grade plywood. Used for formwork, hoarding and structural cladding. CE marked. Located in Leeds — collection or arranged regional delivery available. Direct from Leeds Urban Reclamation, a demolition operating out of Leeds; live for 16 days.
This is exactly the kind of material that typically ends up in a skip costing the seller money; buying it diverts it back into a build. It is graded down on appearance alone; structurally and functionally it performs as A-grade.
This listing carries no CO₂-saved figure because the material is new; the sustainability win here is waste prevention — first-quality stock staying out of the waste stream entirely.
Reuse is the single fastest way to cut a build's embodied carbon — substitution beats offsetting every time.
The headline saving on this listing (waste avoidance) is benchmarked against felling, milling and kiln-drying virgin softwood (~0.45 kg CO₂e per kg of new timber). That's the embodied-carbon figure — the emissions locked into new material at the point of manufacture, before it ever reaches your site.
In UK building terms, embodied carbon typically accounts for 40–60% of a project's whole-life emissions once operational energy is decarbonised. Reusing timber like this lot from Leeds bypasses the manufacturing stage entirely, which is why substitution consistently outperforms offsetting on lifecycle assessments.
For projects tracking against Part Z (the proposed embodied-carbon amendment to the Building Regulations), BREEAM Mat 01 credits, or the RIBA 2030 Climate Challenge, reused material counts at zero embodied carbon in the A1–A3 modules. Keep the seller invoice, this listing URL and the CO₂e figure together in your carbon file.
Beyond carbon: buying this lot from Leeds Urban Reclamation keeps first-quality timber out of the UK construction waste stream (currently ~62 million tonnes/year, per DEFRA). It supports the circular-economy supply chain — sellers who divert stock only continue diverting when there's a viable resale route.
Where the listing states a grade (C16/C24) the stamp is on the timber. Reclaimed boards from Leeds Urban Reclamation are sold for non-structural use unless re-graded by an inspector.
The seller has metal-detected the stock; expect the odd missed fixing — budget 1 saw blades for a lot this size and check with a detector before machining.
Keep it stick-stacked, off the ground and under cover, and let it acclimatise on site for 7–14 days before fixing internally.
Leeds Urban Reclamation issues a VAT invoice on collection or dispatch — bank transfer is standard, card on request. For anything over £500 we recommend a written spec confirmation before paying, so the exact timber description and quantity are on record.
A short reservation (typically 48–72 hours) is usually possible with a 10% holding deposit. Surplus stock moves quickly, especially b-grade lots at this price point — confirm the hold in writing so the seller doesn't re-list.
The material itself carries the same certifications as merchant stock; document the reuse route in your carbon log even without a specific CO₂e figure — waste avoidance still counts under Part Z reporting guidance.
Surplus OSB3 18mm tongue-and-groove flooring sheets from a cancelled order. Sealed pack, dry-stored under cover. 32% off list price.
Surplus PEFC-certified structural timber. Kiln-dried, grade-stamped. Suitable for joists, rafters and load-bearing studwork. Located in Leeds — collection or arranged regional delivery available.
Genuine reclaimed scaffold boards with banded ends. Perfect for shelving, cladding, garden furniture and rustic decking. Located in Leeds — collection or arranged regional delivery available.